Headquarters building: 450 N Street, Sacramento
450 N Street Day Care Reports
Elevator Shaft Photos, September 2008
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Elevators | Elevator Shaft 1 | HTI | Completed | Received/Posted | August 12, 2008 – Elevator Shaft 1 Photos |
Elevators | Elevator Shaft 2 | HTI | Completed | Received/Posted | August 12, 2008 – Elevator Shaft 2 Photos |
Elevators | Elevator Shaft 3 | HTI | Completed | Received/Posted | August 12, 2008 – Elevator Shaft 3 Photos |
Elevators | Elevator Shaft 4 | HTI | Completed | Received/Posted | August 12, 2008 – Elevator Shaft 4 Photos |
Elevators | Elevator Shaft 5 | HTI | Completed | Received/Posted | August 17, 2008 – Elevator Shaft 5 Photos |
Elevators | Elevator Shaft 6 | HTI | Completed | Received/Posted | August 17, 2008 – Elevator Shaft 6 Photos |
Elevators | Elevator Shaft 7 | HTI | Completed | Received/Posted | August 20, 2008 – Elevator Shaft 7 Photos |
Elevators | Elevator Shaft 8 | HTI | Completed | Received/Posted | August 18, 2008 – Elevator Shaft 8 Photos |
Elevators | Elevator Shaft 9 | HTI | Completed | Received/Posted | August 18, 2008 – Elevator Shaft 9 Photos |
Elevators | Elevator Shaft 10 | HTI | Completed | Received/Posted | August 11, 2008 – Elevator Shaft 10 Photos |
Elevators | Freight Elevator Shaft | HTI | Completed | Received/Posted | August 11, 2008 – Freight Elevator Shaft Photos |
Elevators | Response to August 6 David Gau Letter | DGS | Completed | Received/Posted | August 11, 2008 – DGS Letter Response to Gau Inquiry |
Elevators | Highlight Investigative Work | David Gau | Completed | Received/Posted | August 8, 2008 – Additional Water Intrusion Investigative Work |
Elevators | Request for Work Plan | David Gau | Completed | Received/Posted | August 8, 2008 – Letter to HTI from David Gau – Elevator Shaft and 21st Floor Odors |
Elevators | Request for Clarification | David Gau | Completed | Received/Posted | August 6, 2008 – Follow up Letter to DGS from David Gau |
Elevators | Preliminary Elevator Survey | LaCroix Davis | Completed | Received/Posted | August 4, 2008 – Preliminary Elevator Survey and Planned Scope of Work |
Elevators | Discovery of Evidence of Water Intrusion | HTI | Completed | Received/Posted | August 1, 2008 – Discovery of Evidence of Water Intrusion – Elevator shafts |
Elevators | Request for preliminary report | David Gau | Completed | Received/Posted | August 1, 2008 – Letter to DGS from David Gau – Elevator Shafts |
Elevators | Air Quality Report | HTI | Completed | Received/Posted | July 28, 2008 – Limited Fungal Growth Exposure Assessment Survey Report |
Elevators | Visual Inspection Memo | HTI | Completed | Received/Posted | July 25, 2008 – Elevator Shafts Visual Inspection Memo |
Elevators | Elevator Survey | LaCroix Davis | Completed | Received/Posted | July 24, 2008 – Preliminary Elevator Survey |
450 N Street Elevator Reports
Floor Ducts
Odor Reports
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Odor Reports | Indoor Air Quality/Odor Assessment | LaCroix Davis | Completed | Received/Posted | June 18, 2012 – Indoor Air Quality/Odor Assessment |
Odor Reports | Indoor Air Quality/Odor Assessment | LaCroix Davis | Completed | Received/Posted | June 18, 2012 – Appendix A EMLab Laboratory Reports |
Odor Reports | Indoor Air Quality/Odor Assessment | LaCroix Davis | Completed | Received/Posted | June 18, 2012 – Appendix B EAS Laboratory Reports |
Odor Reports | Posting of Proposition 65 Warnings | HTI | Completed | Received/Posted | August 19, 2011 – Posting of Proposition 65 Warnings |
Odor Reports | Odor Investigation Report | LaCroix Davis | Completed | Received/Posted | May 24, 2011 – 19th,21st and 22nd Floor Tile and Odor Investigation Report |
Restrooms
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Restrooms | MRC: Restrooms | HTI | Completed | Received/Posted | May 8, 2009 – Review of Microbial Assessment of Rest Room Areas |
Restrooms | MRC: Restrooms | Biomax | Completed | Received/Posted | April 10, 2009 – Microbial Assessment of Rest Room Areas |
Janitor Closets
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Janitor Closets | MRC: Janitor Closets | HTI | Completed | Received/Posted | May 21, 2009 – Review of Microbial Assessment of Janitor "Hopper" Room Areas |
Janitor Closets | MRC: Janitor Closets | Biomax | Completed | Received/Posted | May 7, 2009 – Microbial Assessment of Janitor "Hopper" Room Areas |
Floor 1
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
1 | DGS Proposed Remediation Areas | HTI | Proposed | Received/Posted | DGS Proposed Remediation Areas |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
1 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
1 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
1 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
1 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
1 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
1 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
1 | Occupational Noise Exposure Monitoring and Sound Level Survey | HTI | Completed | Received/Posted | September 2012 – Mail Room 143 Noise Exposure Survey |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
1 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
1 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
1 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
1 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
1 | Asbestos and Lead Based Paint Survey | LaCroix Davis | Completed | Received/Posted | February 29, 2012 – Asbestos and Lead Based Paint Survey |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
1 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
1 | Airborne Fibrous Glass Exposure Assessment Survey | HTI | Completed | Received/Posted | October 27, 2011 – Airborne Fibrous Glass Exposure Assessment Survey, Print Room 139 |
1 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
1 | Exposure Potential Monitoring for Volatile Organic Compounds | HTI | Completed | Received/Posted | June 15, 2010 – Exposure Potential Monitoring for Volatile Organic Compounds, 1st Floor and Garage Areas |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 18, 2009 – Limited Fungal Growth Exposure Assessment Survey, First Floor Day Care |
1 | Indoor Air Quality Survey | HTI | Completed | Received/Posted | September 4, 2008 – Limited Indoor Air Quality Survey – 1st Floor |
1 | Room 135 Assessment Report | HTI | Completed | Received/Posted | August 1, 2008 – Print Room 135 Report |
1 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
1 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 16, 2008 – First Floor Security Guard Kiosk |
1 | Indoor Air Quality Assessment | HTI | In progress | Requested/Pending | |
1 | Sprinkler Leak | HTI | |||
1 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
1 | Day Care | HTI | Completed | Requested/Posted | May 1, 2008 – HTI Report |
1 | 1st Floor Assessment Report | HTI | Completed | Received/Posted | April 16, 2008 – HTI Report |
1 | Airborne Total Fungi Results | HTI | Completed | Received/Posted | April 9, 2008 – Airborne Total Fungi Results, 1st Floor (Tables Only) |
1 | Day Care | HTI | Completed | Received/Posted | January 7, 2008 – HTI Report |
1 | Mail Room | HTI | Completed | Received/Posted | December 10, 2007 – HTI Report |
1 | Mail Room | HTI | Completed | Received/Posted | November 15, 2007 – HTI Report |
1 | Day Care | HTI | Completed | Received/Posted | November 28, 2007 HTI Report |
1 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
1 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – Microtest |
1 | Air sampling | DGS | Completed | Posted | January 22, 2007 – MicroTest Report |
1 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
1 | MRC: Indoor Air Quality Survey | HTI | Completed | Received/Posted | September 4, 2008 – Limited Indoor Air Quality Survey – 1st Floor |
1 | Break Rooms: 136 | BioMax | Completed | Received/Posted | January 20, 2010 – Post Mitigation Assessment Report Break Rooms 1719 and 136 |
1 | Break Rooms: 143 | BioMax | Completed | Received/Posted | August 14, 2008 – Post Mitigation Assessment Report – Break Rooms 704, 143 and Areas 2304 and 23 Women's Restroom (Updated February 12, 2010) – Previous Report |
1 | MRC: First Floor Janitor "Hopper" Room | BioMax | Completed | Received/Posted | September 29, 2008 – Microbial Assessment and Mitigation Procedures First Floor Janitor "Hopper" Room |
1 | MRC: First Floor Security Kiosk and Plenum Area | BioMax | Completed | Received/Posted | September 25, 2008 – Post Mitigation Assessment Report First Floor Security Kiosk and Plenum Area |
1 | MRC: First Floor Security Kiosk Area | HTI | Completed | Received/Posted | August 22, 2008 – Review of Microbial Assessment and Mitigation Procedures First Floor Security Kiosk Area |
1 | MRC: First Floor Security Kiosk Area | BioMax | Completed | Received/Posted | August 19, 2008 – Microbial Assessment and Mitigation Procedures – First Floor Security Kiosk Area |
1 | MRC: Room 143 | BioMax | Completed | Received/Posted | August 14, 2008 – Post Mitigation Assessment Report – Break Rooms 704, 143 and Areas 2304 and 23 Women's Restroom |
1 | MRC: 1st Floor Print Room 135 | HTI | Completed | Received/Posted | July 31, 2008 – Limited Fungal Growth Assessment Survey – 1st Floor Print Room 135 |
1 | MRC: Clearance | BioMax | Completed | Received/Posted | July 26, 2008 – Post Mitigation Assessment, 1st Floor Conference Room Areas |
1 | MRC: First Floor Conference Room Areas | BioMax | Completed | Received/Posted | July 26, 2008 – Post Mitigation Assessment – First Floor Conference Rooms |
1 | MRC: Security Kiosk | HTI | Completed | Received/Posted | June 16, 2008 – First Floor Security Kiosk Limited Fungal Growth Exposure Assessment Survey |
1 | MRC: Conference Room Areas | HTI | Completed | Received/Posted | April 18, 2008 – Review of Mitigation Procedures for 1st Floor – Conference Room Areas |
1 | MRC: Conference Room Areas | BioMax | Completed | Received/Posted | April 17, 2008 – Mitigation Procedures for 1st Floor – Conference Room Areas |
Floor 2
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
2 | Western Electrical Closet | HTI | Completed | Received/Posted | 2 nd Floor – Western Electrical Closet |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
2 | DGS Proposed Remediation Areas | HTI | Proposed | Received/Posted | DGS Proposed Remediation Areas |
2 | Electrical Closet Assessment Report | HTI | Completed | Received/Posted | BOE 2nd Floor Electrical Closet Remediation |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
2 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
2 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
2 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
2 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
2 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
2 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
2 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
2 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
2 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
2 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
2 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
2 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
2 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
2 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
2 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
2 | Fungal Growth Remediation Monitoring and Clearance Survey, 2nd Floor | HTI | Completed | Received/Posted | December 21, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 2nd Floor |
2 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | November 11, 2010 – Limited Indoor Air Quality Survey, 2nd Floor Pre-Occupancy Assessment |
2 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
2 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 8, 2008 – Limited Indoor Air Quality Survey |
2 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
2 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
2 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
2 | Air sampling | DGS | Completed | Received/Posted | January 22, 2007 – MicroTest Report |
2 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
2 | Air sampling | DGS | Completed | Received/Posted | November 4, 2004 – DGS Report |
2 | Air sampling | DGS | Completed | Received/Posted | July 20, 2004 – DGS Report |
2 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
2 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | December 21, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 2nd Floor |
2 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | November 30, 2010 – Mold Remediation – Second Floor August 30 – October 26, 2010 Closure Report |
2 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 8, 2008 – Limited Indoor Air Quality Survey |
2 | Break Rooms: 214 | BioMax | Completed | Received/Posted | February 9, 2010 – Post Mitigation Assessment Report Break Room 214 |
2 | Break Rooms: 203, 204 | BioMax | Completed | Received/Posted | January 15, 2010 – Post Mitigation Assessment Report Break Rooms 1814, 203 and Adjacent Conference Room 204 |
Floor 3
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
3 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
3 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
3 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
3 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
3 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
3 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
3 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
3 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
3 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
3 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
3 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
3 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
3 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
3 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
3 | Indoor Air Quality Report | HTI | Completed | Received/Posted | May 5, 2010 – Indoor Air Quality Report, 3rd Floor Cubicle 38 Area |
3 | Pre-Occupancy Assessment | HTI | Completed | Received/Posted | May 3, 2010 – Limited Indoor Air Quality Survey, 3rd Floor Pre-Occupancy Assessment |
3 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
3 | Indoor Air Quality Survey | HTI | Completed | Received/Posted | June 25, 2008 – Air Quality Report (revised)* |
3 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
3 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
3 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
3 | Air Sampling | Entek | Completed | Received/Posted | October 26, 2007 – Entek Report |
3 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
3 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
3 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | January 22, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | January 10, 2007 – MicroTest Report |
3 | Air sampling | DGS | Completed | Received/Posted | February 27, 2006 – MicroTest Report |
3 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
3 | Air sampling | DGS | Completed | Received/Posted | November 4, 2004 – DGS Report |
3 | Air sampling | DGS | Completed | Received/Posted | July 20, 2004 – DGS Report |
3 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
3 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | June 18, 2010 – Mold Remediation – 3rd Floor March 15 – April 28, 2010 Closure Report |
3 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | May 3, 2010 – Limited Indoor Air Quality Survey, 3rd Floor Pre-Occupancy Assessment |
3 | MRC: Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 2, 2009 – Limited Fungal Growth Exposure Assessment Survey |
3 | MRC: Indoor Air Quality Survey | HTI | Completed | Received/Posted | June 25, 2008 – Air Quality Report (revised)* |
3 | Break Rooms: 304 | BioMax | Completed | Received/Posted | January 26, 2010 – Post Mitigation Assessment Report Break Rooms 617, 507, 406 and 304 |
3 | Break Rooms: 320 | HTI | Completed | Received/Posted | July 1, 2008 – Review of Mitigation Procedures for 3rd Floor Break Room 320 |
3 | Break Rooms: 320/319 | BioMax | Completed | Received/Posted | August 5, 2008 – Post Mitigation Assessment Report Break Rooms 1905/1908, 1009, and 320/319 |
3 | Break Rooms: 320 | BioMax | Completed | Received/Posted | June 27, 2008 – Mitigation Procedures for 3rd Floor Break Room 320 |
Floor 4
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
4 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
4 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
4 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
4 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
4 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
4 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
4 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
4 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
4 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
4 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
4 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
4 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
4 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
4 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
4 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
4 | Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor | HTI | Completed | Received/Posted | December 22, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor |
4 | 4TH Floor Pre-Occupancy Assessment | HTI | Completed | Received/Posted | August 27, 2009 – Limited Indoor Air Quality Survey – 4TH Floor Pre-Occupancy Assessment |
4 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 1, 2008 – Indoor Air Quality Survey |
4 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
4 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
4 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
4 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
4 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
4 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor | HTI | Completed | Received/Posted | December 22, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 4th Floor |
4 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 18, 2009 – Mold Remediation – 4th Floor June 4, 2009 – August 26, 2009 Closure Report |
4 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | August 27, 2009 – Limited Indoor Air Quality Survey – 4TH Floor Pre-Occupancy Assessment |
4 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 1, 2008 – Indoor Air Quality Survey |
4 | Break Rooms: 415 | BioMax | Completed | Received/Posted | January 29, 2010 – Post Mitigation Assessment Report Break Rooms 610 and 415 |
4 | Break Rooms: 406 | BioMax | Completed | Received/Posted | January 26, 2010 – Post Mitigation Assessment Report Break Rooms 617, 507, 406 and 304 |
Floor 5
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
5 | Follow-up Inspection | HTI | Completed | Received/Posted | 5th Floor Women's Restroom |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
5 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
5 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
5 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
5 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
5 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
5 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
5 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
5 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
5 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
5 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
5 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
5 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
5 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
5 | Odor investigation | HTI | Completed | Received/Posted | December 8, 2008 – 5th Floor Odor investigation |
5 | Storage Area Assessment Report | Biomax | Completed | Received/Posted | November 18, 2008 – Assessment and Mitigation Procedures Report |
5 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
5 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 20, 2008 – Indoor Air Quality Assessment, 5th Floor (revised)* |
5 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
5 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | January 2008 – Limited Fungal Growth Exposure Assessment Survey, 5th Floor Storage Room 5B |
5 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
5 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
5 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | March 29, 2011 – Mold Remediation – 5th Floor January 24 – February 25, 2011 Closure Report |
5 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 20, 2008 – Indoor Air Quality Assessment, 5th Floor (revised)* |
5 | Break Rooms: 507 | BioMax | Completed | Received/Posted | January 26, 2010 – Post Mitigation Assessment Report Break Rooms 617, 507, 406 and 304 |
Floor 6
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
6 | Women's Restroom Water Leak | HTI | Completed | Received/Posted | February 6, 2014 – 7th Floor Women's Restroom Water Leak 450 N Street, Sacramento |
6 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
6 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
6 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
6 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
6 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
6 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
6 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
6 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
6 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
6 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
6 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
6 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
6 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
6 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
6 | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | January 6, 2012 – Limited Drinking Water Quality Assessment |
6 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
6 | Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | November 15, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 6th Floor |
6 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | June 29, 2010 – 6th Floor Pre-Occupancy Assessment |
6 | Storage Area Assessment Report | Biomax | Completed | Received/Posted | November 18, 2008 – Assessment and Mitigation Procedures Report |
6 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 18, 2008 – Limited Indoor Air Quality Survey |
6 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
6 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
6 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
6 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
6 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
6 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | November 15, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 6th Floor |
6 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | June 29, 2010 – Mold Remediation – 6th Floor April 1 – May 5, 2010 Closure Report |
6 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 18, 2008 – Limited Indoor Air Quality Survey |
6 | Break Rooms: 610 | BioMax | Completed | Received/Posted | January 29, 2010 – Post Mitigation Assessment Report Break Rooms 610 and 415 |
6 | Break Rooms: 617 | BioMax | Completed | Received/Posted | January 26, 2010 – Post Mitigation Assessment Report Break Rooms 617, 507, 406 and 304 |
Floor 7
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
7 | Women's Restroom Water Leak | HTI | Completed | Received/Posted | February 6, 2014 – 7th Floor Women's Restroom Water Leak 450 N Street, Sacramento |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
7 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
7 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
7 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
7 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
7 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
7 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
7 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
7 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
7 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
7 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
7 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
7 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
7 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
7 | Air Monitoring for Volatile Organic Compounds (VOC's) | Entek | Completed | Received/Posted | November 30, 2011 – Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's) |
7 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
7 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | July 30, 2010 – Limited Indoor Air Quality Survey,Pre-Occupancy Assessment |
7 | Employee Inquiry, Cubicle 140 | HTI | Completed | Posted | October 8, 2008 – Limited Fungal Growth Assessment Report |
7 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
7 | Report On The 7th Floor | BioMax Environmental, LLC | Completed | Received/Posted | BioMax Email Report Regarding Break Room 704 |
7 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 18, 2008 – 7th Floor Indoor Air Quality Report (revised)* |
7 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
7 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
7 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
7 | Air sampling | DGS | Completed | Posted | October 4, 2007 – MicroTest Report |
7 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
7 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
7 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
7 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | September 21, 2010 – 7th Floor Fungal Growth Remediation Monitoring and Clearance Survey |
7 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | August 10, 2010 – Mold Remediation – 7th Floor June 23 – July 16, 2010 Closure Report |
7 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 18, 2008 – 7th Floor Indoor Air Quality Report (revised)* |
7 | Break Rooms: 707 and 706 | BioMax | Completed | Received/Posted | October 7, 2008 – Post-Mitigation Assessment Report for 7th Floor Break Rooms 706 and 707 (Updated February 12, 2010) – Previous Report |
7 | Break Rooms: 704 | BioMax | Completed | Received/Posted | August 14, 2008 – Post Mitigation Assessment Report – Break Rooms 704, 143 and Areas 2304 and 23 Women's Restroom (Updated February 12, 2010) – Previous Report |
Floor 8
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
8 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
8 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
8 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
8 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
8 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
8 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
8 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
8 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
8 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
8 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
8 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
8 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
8 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
8 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
8 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
8 | Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | October 15, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys, 8th Floor |
8 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | August 27, 2010 – Limited Indoor Air Quality Survey, 8th Floor Pre-Occupancy Assessment |
8 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
8 | Indoor Air Quality Assessment | HTI | Completed | Requested/Posted | June 27, 2008 – Indoor Air Quality Survey (revised)* |
8 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
8 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
8 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
8 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
8 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
8 | Window Reports: Spandrel Panel Failure | McGinnis Chen Associates Inc | Completed | Received/Posted | January 11, 2012 – Glass Breakage Report |
8 | Window Reports: Spandrel Panel Failure | Simpson Gumpertz & Heger | Completed | Received/Posted | Project 060230 – Spandrel Glass Stress Measurement |
8 | Window Reports: Spandrel Panel Failure | Simpson Gumpertz & Heger | Completed | Received/Posted | Spandrel Glass Stress Measurement |
8 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | October 15, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys, 8th Floor |
8 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | August 17, 2010 – Mold Remediation – 8th Floor July 1 – August 9, 2010 Closure Report |
8 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 27, 2008 – Indoor Air Quality Survey (revised)* |
8 | Break Rooms: 808 | BioMax | Completed | Received/Posted | February 2, 2009 – Post Mitigation Assessment Report Break Rooms 2113, 1402, 903 and 808 |
8 | Break Rooms: 807 | BioMax | Completed | Received/Posted | September 22, 2008 – Post Mitigation Assessment Report Break Room 807, 22nd and 23rd Floor Hopper (Janitor) Rooms (Updated February 12, 2010) – Previous Report |
Floor 9
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
9 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | March 22, 2016 – Indoor Air Quality Assessment 9th Floor Cubicle 56 |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
9 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
9 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
9 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
9 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
9 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
9 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
9 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
9 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
9 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
9 | Fungal Growth Remediation Monitoring and Clearance Surveys | HTI | Completed | Received/Posted | April 4, 2012 – 9th Floor Storage Room 9D |
9 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
9 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | Survey Storage Room 9D – Investigative Opening |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
9 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
9 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
9 | Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | August 20, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys, 9th Floor |
9 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | May 24, 2010 – Indoor Air Quality and Surface Fungal Growth Assessment 9th Floor Men’s Restroom |
9 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 9th Floor Pre-Occupancy Assessment |
9 | Post Cleaning Survey Report | HTI | Completed | Received/Posted | April 6, 2009 – 9th Floor Post Cleaning Survey Report |
9 | Flood – Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | April 3, 2009 – 9th Floor Limited Fungal Growth Exposure Assessment Survey |
9 | Indoor Air Quality Assessment | HTI | Completed | Requested/Posted | August 22, 2008 – Limited Indoor Air Quality Survey – 9th Floor |
9 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
9 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
9 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
9 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
9 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
9 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
9 | Window Reports: Spandrel Panel Failure | McGinnis Chen Associates Inc | Completed | Received/Posted | January 11, 2012 – Glass Breakage Report |
9 | Window Reports: Spandrel Panel Failure | Simpson Gumpertz & Heger | Completed | Received/Posted | Project 060230 – Spandrel Glass Stress Measurement |
9 | Window Reports: Spandrel Panel Failure | Simpson Gumpertz & Heger | Completed | Received/Posted | Spandrel Glass Stress Measurement |
9 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | August 20, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys, 9th Floor |
9 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 9th Floor Pre-Occupancy Assessment |
9 | MRC: Review of Mitigation Procedures – 9th Floor Water Release Incident and Resultant Impacted Areas | HTI | Completed | Received/Posted | |
9 | MRC: Post Cleaning Survey Report | HTI | Completed | Received/Posted | April 6, 2009 – 9th Floor Post Cleaning Survey Report |
9 | MRC: Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | April 3, 2009 – 9th Floor Limited Fungal Growth Exposure Assessment Survey |
9 | MRC: Mitigation Procedures – 9th Floor Water Release Incident and Resultant Impacted Areas | BioMax | Completed | Received/Posted | March 31, 2009 – Mitigation Procedures – 9th Floor Water Release Incident and Resultant Impacted Areas |
9 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 22, 2008 – Limited Indoor Air Quality Survey – 9th Floor |
9 | Break Rooms: 910 | BioMax | Completed | Received/Posted | February 4, 2010 – Post Mitigation Assessment Report Break Room 910 |
9 | Break Rooms: 905 | BioMax | Completed | Received/Posted | February 2, 2010 – Post Mitigation Assessment Report Break Room 905 |
9 | Break Rooms: 903 | BioMax | Completed | Received/Posted | February 2, 2009 – Post Mitigation Assessment Report Break Rooms 2113, 1402, 903 and 808 |
Floor 10
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
10 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | March 24, 2016 – Indoor Air Quality Assessment 10th and 22nd Floors |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
10 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
10 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
10 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
10 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
10 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
10 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
10 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
10 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
10 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
10 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
10 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
10 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
10 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
10 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 6, 2011 – Limited Fungal Growth Exposure Assessment Survey, 10th Floor |
10 | Fungal Growth Remediation Monitoring Clearance Surveys | HTI | Completed | Received/Posted | August 18, 2010 – 10th Floor Fungal Growth Remediation Monitoring Clearance Surveys |
10 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | June 30, 2010 – 10th Floor Pre-Occupancy Assessment |
10 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 31, 2008 – Limited Indoor Air Quality Survey |
10 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
10 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
10 | Air Sampling Report | HTI | Completed | Received/Posted | February 29, 2008 – 10th Floor Break Room |
10 | Breakroom Health Impact | Munday | Completed | Received/Posted | February 6, 2008 – Munday Report |
10 | Break Room Air Sampling | HTI | Completed | Received/Posted | February 1, 2008 – HTI Report |
10 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
10 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
10 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
10 | Break Rooms: 1009 | BioMax | Completed | Received/Posted | August 5, 2008 – Post Mitigation Assessment Report Break Rooms 1905/1908, 1009, and 320/319 |
10 | Break Rooms: 1004 | BioMax | Completed | Received/Posted | March 19, 2008 – Post Mitigation Assessment – 10th Floor Break Room Areas (Updated February 12, 2010) – Previous Report |
10 | Break Rooms: Breakroom Clearance | HTI | Completed | Received/Posted | February 29, 2008 – HTI Report |
10 | Break Rooms: 1002, 1003, 1004 | BioMax | Completed | Received/Posted | February 8, 2008 – Mitigation Procedures for 10th Floor – Break Room Area |
Floor 11
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
11 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
11 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
11 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
11 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
11 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
11 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
11 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
11 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
11 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
11 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
11 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
11 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
11 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
11 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
11 | 11TH Floor Pre-Occupancy Assessment | HTI | Completed | Received/Posted | October 16, 2009 – Limited Indoor Air Quality Survey – 11TH Floor Pre-Occupancy Assessment |
11 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
11 | Indoor Air Quality Assessment, 11th Floor | HTI | Completed | Received/Posted | June 19, 2008 – Limited Indoor Air Quality Survey, 11th Floor (revised)* |
11 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
11 | 12th Floor Pipe Leak | HTI | |||
11 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
11 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
11 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
11 | Air Sampling | Entek | Completed | Received/Posted | October 26, 2007 – Entek Report |
11 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
11 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
11 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
11 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
11 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
11 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
11 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
11 | Air sampling | DGS | Completed | Received/Posted | November 4, 2004 – DGS Report |
11 | Air sampling | DGS | Completed | Received/Posted | July 20, 2004 – DGS Report |
11 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
11 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 18, 2009 – Mold Remediation – 11th Floor June 10, 2009 – October 8, 2009 Closure Report |
11 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | October 16, 2009 – Limited Indoor Air Quality Survey – 11TH Floor Pre-Occupancy Assessment |
11 | MRC: Review of Microbial Assessment | HTI | Completed | Received/Posted | June 16, 2009 – Review of Microbial Assessment of 11th Floor |
11 | MRC: Microbial Assessment | BioMax | Completed | Received/Posted | June 11, 2009 – Microbial Assessment of 11th Floor |
11 | MRC: 11th Floor Reoccupation Concerns | HTI | Completed | Received/Posted | May 15, 2009 – 11th Floor Reoccupation Concerns |
11 | MRC: Post-Inspection Clearance Assessment Report | BioMax | Completed | Received/Posted | December 5, 2008 – Post Inspection Clearance Assessment Report LaCroix Davis Investigative Areas – 11th Floor Containments |
11 | MRC: Post-Inspection Clearance Assessment Report | LaCroix Davis | Completed | Received/Posted | December 1, 2008 – Post-Inspection Clearance Assessment Report LaCroix Davis Investigative Activities – 11th Floor |
11 | MRC: Containment and Clearance Procedures | BioMax | Completed | Received/Posted | November 20, 2008 – Containment and Clearance Procedures, LaCroix Davis Destructive Inspection Activities – 11th Floor |
11 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 19, 2008 – Limited Indoor Air Quality Survey, 11th Floor (revised)* |
11 | Break Rooms: 1103 | BioMax | Completed | Received/Posted | December 30, 2008 – Post Mitigation Assessment Report Break Room 1103 |
Mezzanine
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
Mezzanine | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
Mezzanine | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
Mezzanine | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
Mezzanine | HVAC System Investigation | LaCroix Davis | Completed | Received/Posted | June 5, 2012 – Heating, Ventilation and Air Conditioning (HVAC) System Investigation |
Mezzanine | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
Mezzanine | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
Mezzanine | Asbestos and Lead Based Paint Survey | LaCroix Davis | Completed | Received/Posted | February 29, 2012 – Asbestos and Lead Based Paint Survey |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
Mezzanine | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
Mezzanine | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | January 6, 2012 – Limited Drinking Water Quality Assessment |
Mezzanine | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
Mezzanine | Response to July 22 DGS Memo | HTI | Completed | Received/Posted | August 3, 2011 – Response to California Department of General Services Letter Dated July 22, 2011 |
Mezzanine | Mechanical Duct Testing Results | DGS | Completed | Received/Posted | July 22, 2011 – Mechanical Duct Testing Results, M Floor Supply Fans 3 and 4 |
Mezzanine | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | July 15, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys M Floor Supply Fans 3 & 4 |
Mezzanine | Fungal Growth Remediation Monitoring and Exposure Assessment Survey | HTI | Completed | Received/Posted | May 25, 2011 – Fungal Growth Remediation Monitoring and Exposure Assessment Survey, M Floor Supply Fans 1 & 2 Room |
Mezzanine | Fungal Growth Remediation Monitoring and Exposure Assessment Survey | HTI | Completed | Received/Posted | April 21, 2011 – Fungal Growth Remediation Monitoring and Exposure Assessment Surveys, M Floor Supply Fans 3 & 4 Room |
Mezzanine | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
Mechanical | MRC: Mold Remediation Closure Report | LaCroix Davis LLC | Completed | Received/Posted | February 17, 2012 – Mold Remediation – Mechanical Floor April 1 – August 24, 2011 Closure Report |
Mezzanine | MRC: Ducts | HTI | Completed | Received/Posted | August 3, 2011 – Response to California Department of General Services Letter Dated July 22, 2011 |
Mezzanine | MRC: Ducts | DGS | Completed | Received/Posted | July 22, 2011 – Mechanical Duct Testing Results, M Floor Supply Fans 3 and 4 |
Mezzanine | MRC: Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | July 15, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys M Floor Supply Fans 3 & 4 |
Mezzanine | MRC: Fungal Growth Remediation and Exposure Assessment Survey | HTI | Completed | Received/Posted | May 25, 2011 – Fungal Growth Remediation Monitoring and Exposure Assessment Survey, M Floor Supply Fans 1 & 2 Room |
Mezzanine | MRC: Fungal Growth Remediation and Exposure Assessment Survey | HTI | Completed | Received/Posted | April 21, 2011 – Fungal Growth Remediation Monitoring and Exposure Assessment Surveys, M Floor Supply Fans 3 & 4 Room |
Mezzanine | Break Room on Mezzanine Floor | BioMax | Completed | Received/Posted | February 5, 2010 – Post Mitigation Assessment Report Break Room on Mezzanine Floor |
Floor 14
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
14 | DGS Proposed Remediation Areas | HTI | Proposed | Received/Posted | DGS Proposed Remediation Areas |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
14 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
14 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
14 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
14 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
14 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
14 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
14 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
14 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
14 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
14 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
14 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
14 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
14 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
14 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
14 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
14 | Fungal Growth Abatement Monitoring | HTI | Completed | Received/Posted | July 23, 2010 – Fungal Growth Abatement Monitoring and Fungal Growth Abatement Clearance Surveys, 14th Floor |
14 | 14TH Floor Pre-Occupancy Assessment | HTI | Completed | Received/Posted | October 20, 2009 – Limited Indoor Air Quality Survey, 14th Floor Pre-Occupancy Assessment |
14 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | September 15, 2008 – Limited Indoor Air Quality Survey |
14 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
14 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
14 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
14 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
14 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
14 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
14 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 18, 2009 – Mold Remediation – 14th Floor September 3, 2009 – October 1, 2009 Closure Report |
14 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | October 20, 2009 – Limited Indoor Air Quality Survey, 14th Floor Pre-Occupancy Assessment |
14 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | September 15, 2008 – Limited Indoor Air Quality Survey |
14 | Break Rooms: 1408, 1409, 1410 | BioMax | Completed | Received/Posted | January 22, 2010 – Post Mitigation Assessment Report Break Room 1409 and Adjacent Rooms 1408 and 1410 |
14 | Break Rooms: 1402 | BioMax | Completed | Received/Posted | February 2, 2009 – Post Mitigation Assessment Report Break Rooms 2113, 1402, 903 and 808 |
Floor 15
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
15 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
15 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
15 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
15 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
15 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
15 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
15 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
15 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
15 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
15 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
15 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
15 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
15 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
15 | Fungal Growth Remediation Monitoring and Clearance | HTI | Completed | Received/Posted | July 29, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys |
15 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 15th Floor Pre-Occupancy Assessment |
15 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
15 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 13, 2008 – Indoor Air Quality Survey (revised)* |
15 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
15 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
15 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
15 | Air sampling | LaCroix Davis | Completed | Posted | January 18, 2006 – LaCroix Davis Report |
15 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
15 | MRC: Fungal Growth Remediation Monitoring and Clearance | HTI | Completed | Received/Posted | July 29, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys |
15 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 15th Floor Pre-Occupancy Assessment |
15 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 18, 2009 – Mold Remediation – 15th Floor October 9, 2009 – November 13, 2009 Closure Report |
15 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | June 13, 2008 – Indoor Air Quality Survey (revised)* |
15 | Break Rooms: 1508 | BioMax | Completed | Received/Posted | January 13, 2010 – Post Mitigation Assessment Report Break Rooms 1805, 1710 and 1508 |
15 | Break Rooms: 1504 | BioMax | Completed | Received/Posted | January 5, 2009 – Post Mitigation Assessment Report Break Rooms 1603 and 1504 |
Floor 16
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
16 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
16 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
16 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
16 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
16 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
16 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
16 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
16 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
16 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
16 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
16 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
16 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
16 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
16 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
16 | Fungal Growth Remediation Monitoring and Clearance Surveys | HTI | Completed | Received/Posted | July 30, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys |
16 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 16th Floor Pre-Occupancy Assessment |
16 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
16 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | September 11, 2008 – Limited Indoor Air Quality Survey |
16 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
16 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
16 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
16 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
16 | MRC: Fungal Growth Remediation Monitoring and Clearance Surveys | HTI | Completed | Received/Posted | July 30, 2010 – Fungal Growth Remediation Monitoring and Clearance Surveys |
16 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 16th Floor Pre-Occupancy Assessment |
16 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 18, 2009 – Mold Remediation – 16th Floor October 26, 2009 – December 11, 2009 Closure Report |
16 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | September 11, 2008 – Limited Indoor Air Quality Survey |
16 | Break Rooms: 1616, 1602 | BioMax | Completed | Received/Posted | January 7, 2010 – Post Mitigation Assessment Report Break Rooms 2108, 2106, 1616 and 1602 |
16 | Break Rooms: 1603 | BioMax | Completed | Received/Posted | January 5, 2009 – Post Mitigation Assessment Report Break Rooms 1603 and 1504 |
Floor 17
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
17 | Drain Pipe Leak Assessment Report | HTI | Completed | Received/Posted | 17th Floor – Drain Pipe Leak |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
17 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
17 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
17 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
17 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
17 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
17 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
17 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
17 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
17 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
17 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
17 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
17 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
17 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
17 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
17 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | January 21, 2011 – 17th Floor Pre-Occupancy Assessment |
17 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
17 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 25, 2008 – Limited Indoor Air Quality Survey |
17 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
17 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
17 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
17 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
17 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
17 | MRC: Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | January 21, 2011 – 17th Floor Pre-Occupancy Assessment |
17 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | December 7, 2010 – Mold Remediation – 17th Floor November 3 – December 2, 2010 Closure Report |
17 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 25, 2008 – Limited Indoor Air Quality Survey |
17 | Break Rooms: 1719 | BioMax | Completed | Received/Posted | January 20, 2010 – Post Mitigation Assessment Report Break Rooms 1719 and 136 |
17 | Break Rooms: 1710 | BioMax | Completed | Received/Posted | January 13, 2010 – Post Mitigation Assessment Report Break Rooms 1805, 1710 and 1508 |
Floor 18
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
18 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
18 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
18 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
18 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
18 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
18 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
18 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
18 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
18 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
18 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
18 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
18 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
18 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
18 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
18 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 18th Floor Pre-Occupancy Assessment |
18 | Indoor Air Quality Survey | HTI | Completed | Received/Posted | September 8, 2008 – |
18 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
18 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
18 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
18 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
18 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
18 | Mold Evaluation | Entek | Completed | Received/Posted | June 15, 2007 – Entek Report |
18 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
18 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
18 | Investigation Comments and Findings | McGinnin Chen Associates Inc | Completed | Received/Posted | 450 N Street Vision Glass 18th Floor Cracks – #12080.00 RP |
18 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | October 4, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 18th Floor |
18 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | May 27, 2010 – Mold Remediation – 18th Floor January 20, 2010 – March 2, 2010 Closure Report |
18 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 2, 2010 – Limited Indoor Air Quality Survey, 18th Floor Pre-Occupancy Assessment |
18 | Break Rooms: 1814 | BioMax | Completed | Received/Posted | January 15, 2010 – Post Mitigation Assessment Report Break Rooms 1814, 203 and Adjacent Conference Room 204 |
18 | Break Rooms: 1805 | BioMax | Completed | Received/Posted | January 13, 2010 – Post Mitigation Assessment Report Break Rooms 1805, 1710 and 1508 |
Floor 19
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
19 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
19 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
19 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
19 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
19 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
19 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
19 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
19 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
19 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
19 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
19 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
19 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
19 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
19 | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | January 6, 2012 – Limited Drinking Water Quality Assessment |
19 | Air Monitoring for Volatile Organic Compounds (VOC's) | Entek | Completed | Received/Posted | November 30, 2011 – Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's) |
19 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
19 | Posting of Proposition 65 Warnings | HTI | Completed | Received/Posted | August 19, 2011 – Posting of Proposition 65 Warnings |
19 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | February 11, 2011 – 19th Floor Pre-Occupancy Assessment |
19 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 20, 2008 – Limited Indoor Air Quality Survey |
19 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
19 | Odor Investigation Report | LaCroix Davis | Completed | Received/Posted | May 24, 2011 – 19th Floor Tile and Odor Investigation Report |
19 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
19 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
19 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
19 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
19 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
19 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
19 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | February 28, 2011 – Mold Remediation – 19th Floor December 7, 2010 – January 12, 2011 Closure Report |
19 | MRC: Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | February 11, 2011 – 19th Floor Pre-Occupancy Assessment |
19 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | August 20, 2008 – Limited Indoor Air Quality Survey |
19 | MRC: Mitigation Procedures | BioMax | Completed | Received/Posted | June 26, 2008 – Microbial Assessment and Mitigation Procedures for 19th Floor Men's Restroom |
19 | MRC: Mitigation Procedures Report | BioMax | Completed | Received/Posted | June 18, 2008 – BioMax Mitigation Procedures Report, Rooms 1905 |
19 | Break Rooms: 1915 | BioMax | Completed | Received/Posted | January 11, 2010 – Post Mitigation Assessment Report Break Rooms 2008 and 1915 |
19 | Break Rooms: 1905/1908 | BioMax | Completed | Received/Posted | August 5, 2008 – Post Mitigation Assessment Report Break Rooms 1905/1908, 1009, and 320/319 |
19 | Break Rooms: 1905 Area | HTI | Completed | Received/Posted | June 12, 2008 – HTI Mitigation Procedures Review – Break Room 1905 Area |
19 | Break Rooms: 1905 Area | BioMax | Completed | Received/Posted | June 12, 2008 – BioMax Mitigation Procedures – Break Room 1905 Area |
Floor 20
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
20 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
20 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
20 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
20 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
20 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
20 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
20 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
20 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
20 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
20 | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | December 7, 2011 – Limited Drinking Water Quality Assessment |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
20 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
20 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
20 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
20 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
20 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
20 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
20 | Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | December 21, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 20th Floor |
20 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | October 14, 2010 – Limited Indoor Air Quality Survey, 20th Floor Pre-Occupancy Assessment |
20 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 3, 2008 –Limited Indoor Air Quality Survey (revised)* |
20 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
20 | Indoor Air Quality Assessment | HTI | Completed | Requested/Pending | |
20 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
20 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
20 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
20 | Air Sampling | DGS | Completed | Received/Posted | October 2, 2007 – MicroTest Report |
20 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
20 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
20 | MRC: Fungal Growth Remediation Monitoring and Clearance Survey | HTI | Completed | Received/Posted | December 21, 2010 – Fungal Growth Remediation Monitoring and Clearance Survey, 20th Floor |
20 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | November 30, 2010 – Mold Remediation – 20th Floor August 9, 2010 – September 30, 2010 Closure Report |
20 | MRC: Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | October 14, 2010 – Limited Indoor Air Quality Survey, 20th Floor Pre-Occupancy Assessment |
20 | MRC: Indoor Air Quality Assessment | HTI | Completed | Received/Posted | July 3, 2008 – Limited Indoor Air Quality Survey (revised)* |
20 | Break Rooms: 2008 | BioMax | Completed | Received/Posted | January 11, 2010 – Post Mitigation Assessment Report Break Rooms 2008 and 1915 |
20 | Break Rooms: 2014 | BioMax | Completed | Received/Posted | December 16, 2008 – Post Mitigation Assessment Report – Break Room 2014 (Updated February 12, 2010) – Previous Report |
20 | Break Rooms: 2014 | HTI | Completed | Received/Posted | May 29, 2008 – HTI response to Mitigation Report, 20th Floor Break Room |
20 | Break Rooms: 2014 | BioMax | Completed | Received/Posted | May 26, 2008 – BioMax Mitigation Report, 20th Floor Break Room |
Floor 21
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
21 | Exposure Potential Air Sampling | HTI | Completed | Received/Posted | September 2014 – Exposure Potential Air Sampling |
21 | 21st Floor Duct Testing Results | DGS | Completed | Received/Posted | August 15th 2014 – Notice of No Violation After Inspection |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
21 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
21 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
21 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
21 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
21 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
21 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
21 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
21 | HVAC System Investigation | LaCroix Davis | Completed | Received/Posted | June 5, 2012 – Heating, Ventilation and Air Conditioning (HVAC) System Investigation |
21 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
21 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
21 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
21 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
21 | Vinyl Composite Tile Investigation Report | LaCroix Davis | Completed | Received/Posted | January 18, 2012 – Vinyl Composite Tile Investigation Report |
21 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
21 | Air Monitoring for Volatile Organic Compounds (VOC's) | Entek | Completed | Received/Posted | November 30, 2011 – Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's) |
21 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
21 | Posting of Proposition 65 Warnings | HTI | Completed | Received/Posted | August 19, 2011 – Posting of Proposition 65 Warnings |
21 | Limited Indoor Air Quality Survey | HTI | Completed | Received/Posted | July 20, 2011 – Limited Indoor Air Quality Survey, 21st Floor Pre-Occupancy Assessment |
21 | 21st Floor Tile and Odor Investigation Report | LaCroix Davis | Completed | Received/Posted | May 24, 2011 – 21st Floor Tile and Odor Investigation Report |
21 | Pre-Occupancy Assessment | HTI | Completed | Received/Posted | March 29, 2010 – Limited Indoor Air Quality Survey, 21st Floor Pre-Occupancy Assessment |
21 | 21st Floor Fungal Growth Beneath Carpeting | HTI | Completed | Received/Posted | January 19, 2010 – 21st Floor Fungal Growth Beneath Carpeting |
21 | 21st Floor Odor Investigation Report | HTI | Completed | Received/Posted | May 4, 2009 – 21st Floor Odor Investigation Report |
21 | Letter to HTI from David Gau | David Gau | Completed | Received/Posted | August 8, 2008 – Letter to HTI from David Gau |
21 | Restroom Assessment Report | HTI | Completed | Received/Posted | June 30, 2008 – Restroom Assessment Report |
21 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
21 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | April 4, 2008 – HTI Report (revised)* |
21 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
21 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
21 | Air Sampling | Entek | Completed | Received/Posted | October 26, 2007 – Entek Report |
21 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
21 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
21 | Air Sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (2) |
21 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
21 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
21 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
21 | Mold Evaluation | Entek | Completed | Received/Posted | June 15, 2007 – Entek Report |
21 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
21 | MRC: Vinyl Composite Tile Investigation Report | LaCroix Davis | Completed | Received/Posted | January 18, 2012 – Vinyl Composite Tile Investigation Report |
21 | MRC: Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | June 18, 2010 – Mold Remediation – 21st Floor December 11, 2009 – April 1, 2010 Closure Report |
21 | MRC: 21st Floor Interior Hallway Carpet | HTI | Completed | Received/Posted | March 31, 2010 – 21st Floor Interior Hallway Carpet |
21 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | March 29, 2010 – Limited Indoor Air Quality Survey, 21st Floor Pre-Occupancy Assessment |
21 | MRC: Protocol Summary | HTI | Completed | Received/Posted | February 5, 2010 – Summary of State Board of Equalization 21st Floor Protocol for Pilot Study, Rev.1 |
21 | MRC: 21st Floor Limited Surface Fungal Growth Potentials Survey | HTI | Completed | Received/Posted | February 5, 2010 – 21st Floor Limited Surface Fungal Growth Potentials Survey – Cubicles and Furniture |
21 | MRC: 21st Floor Fungal Growth Beneath Carpeting | HTI | Completed | Received/Posted | January 19, 2010 – 21st Floor Fungal Growth Beneath Carpeting |
21 | Break Rooms: 2108, 2106 | BioMax | Completed | Received/Posted | January 7, 2010 – Post Mitigation Assessment Report Break Rooms 2108, 2106, 1616 and 1602 |
21 | Break Rooms: 2113 | BioMax | Completed | Received/Posted | February 2, 2009 – Post Mitigation Assessment Report Break Rooms 2113, 1402, 903 and 808 |
Floor 22
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
22 | Indoor Air Quality Assessment | HTI | Completed | Received/Posted | March 24, 2016 – Indoor Air Quality Assessment 10th and 22nd Floors |
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
22 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
22 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
22 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
22 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
22 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
22 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
22 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 14, 2012 – Limited Fungal Growth Exposure Assessment Survey August 2012 QPCR Air Sampling |
22 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
22 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
22 | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | December 7, 2011 – Limited Drinking Water Quality Assessment |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
22 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
22 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
22 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
22 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
22 | Vinyl Composite Tile Investigation Report | LaCroix Davis | Completed | Received/Posted | January 18, 2012 – Vinyl Composite Tile Investigation Report |
22 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
22 | Air Monitoring for Volatile Organic Compounds (VOC's) | Entek | Completed | Received/Posted | November 30, 2011 – Entek Final Report of Air Monitoring for Volatile Organic Compounds (VOC's) |
22 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
22 | Posting of Proposition 65 Warnings | HTI | Completed | Received/Posted | August 19, 2011 – Posting of Proposition 65 Warnings |
22 | Pre-Occupancy Assessment | HTI | Completed | Received/Posted | June 4, 2009 – Limited Indoor Air Quality Survey, 22nd Floor Pre-Occupancy Assessment |
22 | Microbial Assessment | BioMax | Completed | Received/Posted | June 19th, 2008 – Microbial Assessment of 22nd Floor South Plenum Area |
22 | Odor Investigation Report | LaCroix Davis | Completed | Received/Posted | May 24, 2011 – 22nd Floor Tile and Odor Investigation Report |
22 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
22 | Wall Cavity Testing | HTI | Completed | Received/Posted | February 15, 2008 – HTI Report |
22 | January 4, 2008 Storm Water Intrusion | McGinnis Chen | Completed | Received/Posted | January 11, 2008 – Report re Storm Water Intrusions |
22 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
22 | Air sampling | DGS | Completed | Received/ Posted | October 5, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
22 | Mold Evaluation | Entek | Completed | Received/Posted | June 15, 2007 – Entek Report |
22 | Air sampling | DGS | Completed | Received/Posted | May 4, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | May 2, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | January 22, 2007 – MicroTest Report |
22 | Air sampling | DGS | Completed | Received/Posted | December 6, 2006 – DGS |
22 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
22 | Air sampling | DGS | Completed | Received/Posted | December 1, 2005 – DGS Report |
22 | Air sampling | DGS | Completed | Received/Posted | November 4, 2004 – DGS Report |
22 | Air sampling | DGS | Completed | Received/Posted | July 20, 2004 – DGS Report |
22 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
22 | MRC: Vinyl Composite Tile Investigation Report | LaCroix Davis | Completed | Received/Posted | January 18, 2012 – Vinyl Composite Tile Investigation Report |
22 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | June 4, 2009 – Limited Indoor Air Quality Survey, 22nd Floor Pre-Occupancy Assessment |
22 | MRC: Sampling Protocol | HTI | Completed | Received/Posted | June 1, 2009 – 22nd Floor Sampling Protocol |
22 | MRC: Remediation | BioMax | Completed | Received/Posted | Requested/Pending |
22 | MRC: Post Mitigation Final Assessment | BioMax | Completed | Received/Posted | December 9, 2008 – 22nd Floor Post Mitigation Final Assessment |
22 | MRC: Post Inspection Clearance Assessment Report | BioMax | Completed | Received/Posted | October 28, 2008 – Post-Inspection Clearance Assessment Report, LaCroix Davis Inspection Areas, 22nd Floor |
22 | MRC: Fire Proofing Removal Procedures | BioMax | Completed | Received/Posted | October 7, 2008 – 22nd Floor Fire Proofing Removal Procedures |
22 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | September 22, 2008 – Post Mitigation Assessment Report Break Room 807, 22nd and 23rd Floor Janitor Rooms |
22 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 29, 2008 – BioMax Post Mitigation Assessment Report for 22nd Floor West and North Containment Areas |
22 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms |
22 | MRC: Assessment & Mitigation Procedures | BioMax | Completed | Received/Posted | August 25, 2008 – BioMax Assessment & Mitigation Procedure for Floor 23 and 22 Janitor Rooms |
22 | MRC: Clearance | BioMax | Completed | Received/Posted | July 29, 2008 – Post Mitigation Assessment Report, 22nd Floor East |
22 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | July 29, 2008 – Post Mitigation Assessment Report – 22nd Floor East Containment Area |
22 | MRC: Break Room Clearances | HTI | Completed | Received/Posted | June 12, 2008 – 22nd Floor Break Room Clearances |
22 | MRC: Response to Procedures for Destructive Inspection | HTI | Completed | Received/Posted | May 19, 2008 – HTI Response to Procedures for Destructive Inspection and Microbial Mitigation Report |
22 | MRC: Procedures for Destructive Inspection | BioMax | Completed | Received/Posted | May 9, 2008 – BioMax Procedures for Destructive Inspection and Microbial Mitigation Report |
22 | MRC: Response to Clean Up Procedures | HTI | Completed | Received/Posted | May 8, 2008 – HTI Response to BioMax Mitigation Clean Up Procedures for Interior Rooms |
22 | MRC: Clean Up Procedures | BioMax | Completed | Received/Posted | May 7, 2008 – Mitigative and Clean Up Procedures for Interior Rooms (Updated February 12, 2010) – Previous Report |
22 | Break Rooms: Hopper Room | BioMax | Completed | Received/Posted | September 22, 2008 – Post Mitigation Assessment Report Break Room 807, 22nd and 23rd Floor Hopper (Janitor) Rooms (Updated February 12, 2010) – Previous Report |
22 | Break Rooms: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms (Updated February 12, 2010) – Previous Report |
22 | Break Rooms: Break Room Clearances | HTI | Completed | Received/Posted | June 12, 2008 – 22nd Floor Break Room Clearances |
22 | Break Rooms: Lactation Rooms | BioMax | Completed | Received/Posted | March 19, 2008 – Mitigation Procedures for Moisture Impacted – Break Room Area (Updated February 12, 2010) – Previous Report |
Floor 23
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
23 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Third Quarter of 2013 |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
23 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
23 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – QPCR Air Sampling |
23 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | November 19, 2012 – Monthly Air Monitoring Report October 2012 |
23 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 22, 2012 – Limited Fungal Growth Exposure Assessment Survey September 2012 QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
23 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | September 19, 2012 – Monthly Air Monitoring Report August 2012 |
23 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
23 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | July 18, 2012 – Monthly Air Monitoring Report for June 2012 |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | June 11, 2012 – May 2012 QPCR Air Sampling |
23 | Air Monitoring Report | LCD | Completed | Received/Posted | May 22, 2012 – Monthly Air Monitoring Report for April 2012 |
23 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | March, 2012 – QPCR Air Sampling |
23 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
23 | Air Monitoring | LCD | Completed | Received/Posted | May 22, 2012 – Revised Monthly Air Monitoring Report for February 2012 |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2012 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – QPCR Air Sampling |
23 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
23 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
23 | Pre-Occupancy Assessment | HTI | Completed | Received/Posted | August 28, 2009 – Limited Indoor Air Quality Survey – 23RD Floor Pre-Occupancy Assessment |
23 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
23 | Post Mitigation Assessment | BioMax | Completed | Received/Posted | March 31, 2008 – BioMax Report |
23 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
23 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
23 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
23 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
23 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
23 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report (2) |
23 | Mold Evaluation | Entek | Completed | Received/Posted | June 15, 2007 – Entek Report |
23 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
23 | MRC: Remediation | DGS | Completed | Received/Posted | Requested/Pending |
23 | MRC: Clearance | BioMax | Completed | Received/Posted | Requested/Pending |
23 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | August 28, 2009 – Limited Indoor Air Quality Survey – 23RD Floor Pre-Occupancy Assessment |
23 | MRC: Response to DGS letter of November 14, 2008 | BOE Executive Director | Completed | Received/Posted | November 18, 2008 – Letter restating need for final report on the 23rd and 24th floors |
23 | MRC: DGS response letter of November 14, 2008 | Doug Button, DGS Deputy Director | Completed | Received/Posted | November 14, 2008 – Letter stating DGS view re: final report on the 23rd and 24th floors |
23 | MRC: Post Inspection Clearance Assessment Report | BioMax | Completed | Received/Posted | November 11, 2008 – Post Inspection Clearance Assessment Report, LaCroix Davis Investigative Areas – 23rd Floor Containment |
23 | MRC: Response to availability for re-occupancy letter | BOE Executive Director | Completed | Received/Posted | October 30, 2008 – Executive Director Response to DGS letter noting 23rd and 24th floors availability for re-occupancy |
23 | MRC: Availability for reoccupancy letter | DGS | Completed | Received/Posted | October 20, 2008 – DGS letter to David Gau re: 23rd and 24th floor availability for re-occupancy |
23 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | September 26, 2008 – 23rd Floor Post Mitigation Assessment Report |
23 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | September 22, 2008 – Post Mitigation Assessment Report Break Room 807, 22nd and 23rd Floor Janitor Rooms |
23 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms |
23 | MRC: Assessment & Mitigation Procedures | BioMax | Completed | Received/Posted | August 25, 2008 – BioMax Assessment & Mitigation Procedure for Floor 23 and 22 Janitor Rooms |
23 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 14, 2008 – Post Mitigation Assessment Report – Break Rooms 704, 143 and Areas 2304 and 23 Women's Restroom |
23 | MRC: Restroom Clearance | HTI | Completed | Received/Posted | June 9, 2008 – 23rd Floor Men's Restroom Clearance |
23 | MRC: Response to Clean Up Procedures | HTI | Completed | Received/Posted | May 8, 2008 – HTI Response to BioMax Mitigation Clean Up Procedures for Interior Rooms |
23 | MRC: Clean Up Procedures | BioMax | Completed | Received/Posted | May 7, 2008 – Mitigative and Clean Up Procedures for Interior Rooms (Updated February 12, 2010) – Previous Report |
23 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | March 31, 2008 – Post Mitigation Assessment Report – 23rd Floor South and East Containment Areas (Updated February 12, 2010) – Previous Report |
23 | MRC: Response to Mitigation Procedures Report | HTI | Completed | Received/Posted | March 7, 2008 – HTI Response to Mitigation Procedures Report, 23rd Floor North and West |
23 | MRC: Response to Mitigation Procedures Supplement | HTI | Completed | Received/Posted | February 29, 2008 – HTI Response to Mitigation Procedures Supplement, 23rd Floor Mini Coffee Bar and Break Room Areas |
23 | MRC: Mitigation Procedures Report | BioMax | Completed | Received/Posted | February 21, 2008 – BioMax Mitigation Procedures Report, 23rd Floor North and West |
23 | MRC: Mitigation Procedures Supplement | BioMax | Completed | Received/Posted | February 20, 2008 – BioMax Mitigation Procedures Supplement, 23rd Floor Mini Coffee Bar and Break Room Areas |
23 | MRC: Mitigation Procedures | BioMax | Completed | Received/Posted | January 31, 2008 – Mitigation Procedures for Floor 23 East |
23 | MRC: Review of Mitigation Procedures | HTI | Completed | Received/Posted | January 30, 2008 – Review of Mitigation Procedures for 23rd Floor, East Side |
23 | MRC: Mitigation Procedures | BioMax | Completed | Received/Posted | January 25, 2008 – Mitigation Procedures for 23rd Floor, East Side |
23 | MRC: Mitigation Protocol Amendment | BioMax | Completed | Received/Posted | December 13, 2007 – Mitigation Protocol Amendment for 23 South Area |
23 | MRC: Review of Recommended Mitigation Procedures | HTI | Completed | Received/Posted | December 11, 2007 – Review of Recommended Mitigation Procedures for Floor 23 South Side |
23 | MRC: Recommended Mitigation Procedures | BioMax | Completed | Received/Posted | December 10, 2007 – Recommended Mitigation Procedures for Floor 23 South Side |
23 | MRC: Review of Containment Procedures | BioMax | Completed | Received/Posted | December 7, 2007 – Review of Containment Procedures for Floor 23, South Side |
23 | MRC: Containment Procedures | BioMax | Completed | Received/Posted | December 4, 2007 – Containment Procedures for Floor 23, South Side |
23 | Break Rooms: Hopper Room | BioMax | Completed | Received/Posted | September 22, 2008 – Post Mitigation Assessment Report Break Room 807, 22nd and 23rd Floor Hopper (Janitor) Rooms (Updated February 12, 2010) – Previous Report |
23 | Break Rooms: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms |
23 | Break Rooms: 2304 and Women's Restroom | BioMax | Completed | Received/Posted | August 14, 2008 – Post Mitigation Assessment Report – Break Rooms 704, 143 and Areas 2304 and 23 Women's Restroom (Updated February 12, 2010) – Previous Report |
23 | Break Rooms: Break Room, Mini Coffee Bar | BioMax | Completed | Received/Posted | March 19, 2008 – Mitigation Procedures for Moisture Impacted – Break Room Area (Updated February 12, 2010) – Previous Report |
Floor 24
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
24 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | December 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | November 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | October 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | September 2015 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2015 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2015 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2015 – Random Sampling |
24 | DGS Proposed Remediation Areas | HTI | Proposed | Received/Posted | DGS Proposed Remediation Areas |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2014 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2014 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2014 – Random Sampling |
24 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Fourth Quarter of 2013 |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2013 – Random Sampling |
24 | Quarterly Air Monitoring Report | Andersen Environmental | Completed | Received/Posted | Second Quarter of 2013 |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2013 – Random Sampling |
24 | Pipe Investigation Work Conducted 4/26/13 & 4/27/13 | GHD | Completed | Received/Posted | Industrial Hygiene Report for Pipe Investigation Work Conducted 4/26/13 & 4/27/13 |
24 | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 | LCD | Completed | Received/Posted | Statistical Analysis of Monthly Air Monitoring Data for Year 2012 |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
24 | Mold Remediation | LCD | Completed | Received/Posted | January 15, 2013 – Revised Closure Report Addenda |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
24 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | Monthly Air Monitoring Report November 2012 |
24 | Mold Remediation | LCD | Completed | Received/Posted | October 31 2012 – Closure Report Addendum |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2012 – QPCR Air Sampling |
24 | Monthly air monitoring report | LCD | Completed | Received/Posted | October16, 2012 – Monthly Air Monitoring Report September 2012 |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2012 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
24 | VCT Removal Report | LCD | Completed | Received/Posted | August 30, 2012 – Vinyl Composite Tile Removal Report |
24 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | August 15, 2012 – Monthly Air Monitoring Report July 2012 |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2012 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2012 – Random Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2012 – QPCR Air Sampling |
24 | Monthly Air Monitoring Report | LCD | Completed | Received/Posted | June 15, 2012 – Monthly Air Monitoring Report, May 2012 |
24 | Limited Fungal Growth Exposure Assessment Survey | HTI | Completed | Received/Posted | May 10, 2012 – April 2012 QPCR Air Sampling |
24 | Monthly air monitoring report | LaCroix Davis | Completed | Received/Posted | April 12, 2012 – Monthly Monitoring Report for March 2012 |
24 | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2012 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2011 – December 2011 QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2011 – QPCR Air Sampling |
24 | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 18, 2012 – Limited Fungal Growth Exposure Assessment Surveys – Random Air Sampling |
24 | Fungal Growth Inspection and Exposure Assessment Survey | HTI | Completed | Received/Posted | September 30, 2011 – Fungal Growth Inspection and Exposure Assessment Surveys HVAC Systems Investigation |
24 | 24TH Floor Pre-Occupancy Assessment | HTI | Completed | Received/Posted | September 1, 2009 – Limited Indoor Air Quality Survey – 24TH Floor Pre-Occupancy Assessment |
24 | Cal/OHSA Notice of No Violation 5/23/08 | Cal/OHSA | Completed | Received/Posted | May 23, 2008 – Cal/OHSA Notice |
24 | Ceiling Tile Assessment | HTI | Completed | Received/Posted | February 19, 2008 – HTI Report |
24 | Fungi Evaluation | Sterling | Completed | Received/Posted | October 29, 2007 – Sterling Report |
24 | Air sampling | DGS | Completed | Received/Posted | October 5, 2007 – MicroTest Report |
24 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (3) |
24 | Air and Tape sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report (2) |
24 | Air sampling | DGS | Completed | Received/Posted | October 4, 2007 – MicroTest Report |
24 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report |
24 | Air sampling | DGS | Completed | Received/Posted | October 3, 2007 – MicroTest Report(2) |
24 | Air sampling | LaCroix Davis | Completed | Received/Posted | January 18, 2006 – LaCroix Davis Report |
24 | Air sampling | DGS | Completed | Received/Posted | November 4, 2004 – DGS Report |
24 | Air sampling | DGS | Completed | Received/Posted | July 20, 2004 – DGS Report |
24 | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
24 | MRC: Remediation | DGS | Completed | Received/Posted | Requested/Pending |
24 | MRC: Clearance | BioMax | Completed | Received/Posted | Requested/Pending |
24 | MRC: Pre-Occupancy Assessment Report | HTI | Completed | Received/Posted | September 1, 2009 – Limited Indoor Air Quality Survey – 24TH Floor Pre-Occupancy Assessment |
24 | MRC: Response to DGS letter of November 14, 2008 | BOE Executive Director | Completed | Received/Posted | November 18, 2008 – Letter restating need for final report on the 23rd and 24th floors |
24 | MRC: Post Inspection Clearance Assessment Report | BioMax | Completed | Received/Posted | November 17, 2008 – Post Inspection Clearance Assessment Report, LaCroix Davis Investigative Areas – 24th Floor Containment |
24 | MRC: DGS response letter of November 14, 2008 | Doug Button, DGS Deputy Director | Completed | Received/Posted | November 14, 2008 – Letter stating DGS view re: final report on the 23rd and 24th floors |
24 | MRC: Response to availability for re-occupancy letter | BOE Executive Director | Completed | Received/Posted | October 30, 2008 – Executive Director Response to DGS letter noting 23rd and 24th floors availability for re-occupancy |
24 | MRC: Availability for reoccupancy letter | DGS | Completed | Received/Posted | October 20, 2008 – DGS letter to David Gau re: 23rd and 24th floor availability for re-occupancy |
24 | MRC: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms |
24 | MRC: 24th Floor Men’s Restroom Clearances | HTI | Completed | Received/Posted | June 26, 2008 – HTI Report |
24 | MRC: Post Mitigation Clearance Assessment | BioMax | Completed | Received/Posted | May 26, 2008 – BioMax Post Mitigation Clearance Assessment – 24th Floor Men's Restroom and Rooms 2427 and 2428 |
24 | MRC: Response to Clean Up Procedures | HTI | Completed | Received/Posted | May 8, 2008 – HTI Response to BioMax Mitigation Clean Up Procedures for Interior Rooms |
24 | MRC: Clean Up Procedures | BioMax | Completed | Received/Posted | May 7, 2008 – Mitigative and Clean Up Procedures for Interior Rooms (Updated February 12, 2010) – Previous Report |
24 | MRC: Response to Mitigation Procedures | HTI | Completed | Received/Posted | April 30, 2008 – HTI Response to Mitigation Procedures, Rooms 2427 and 2428 |
24 | MRC: Mitigation Procedures | BioMax | Completed | Received/Posted | April 29, 2008 – BioMax Mitigation Procedures, Rooms 2427 and 2428 |
24 | MRC: Review of Recommended Mitigation Procedures | HTI | Completed | Received/Posted | April 14, 2008 – Review of Recommended Mitigation Procedures for Floor 24 – Supplement |
24 | MRC: Recommended Mitigation Procedures | BioMax | Completed | Received/Posted | April 10, 2008 – Recommended Mitigation Procedures for Floor 24 – Supplement |
24 | MRC: Post mitigation Assessment (Breakroom Area) | BioMax | Completed | Received/Posted | April 3, 2008 – BioMax Report |
24 | MRC: Review of Recommended Mitigation Procedures | HTI | Completed | Received/Posted | February 29, 2008 – Review of Recommended Mitigation Procedures for Floor 24 |
24 | MRC: Review of Recommended Mitigation Procedures | HTI | Completed | Received/Posted | January 28, 2008 – Review of Recommended Mitigation Procedures for Floor 24 |
24 | MRC: Recommended Mitigation Procedures | BioMax | Completed | Received/Posted | January 24, 2008 – Recommended Mitigation Procedures for Floor 24 |
24 | Break Rooms: Post Mitigation Assessment Report | BioMax | Completed | Received/Posted | August 26, 2008 – BioMax Post Mitigation Assessment Report – Break rooms 2202, 2223 and 2224 and 22nd Floor Men’s and Women’s Restrooms |
24 | Break Rooms: 24th Floor Break Room Areas | BioMax | Completed | Received/Posted | April 3, 2008 – Post Mitigation Assessment 24th Floor Break Room Areas |
24 | Break Rooms: Break Room, Mini Coffee Bar | BioMax | Completed | Received/Posted | March 19, 2008 – Mitigation Procedures for Moisture Impacted – Break Room Area (Updated February 12, 2010) – Previous Report |
Penthouse
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | July 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | June 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | March 2014 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | September 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | August 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | May 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | April 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | February 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | January 2013 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2012 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | November 2012 – Random Sampling |
Penthouse | Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | October 5, 2012 – Limited Fungal Growth Exposure Assessment Surveys September 2012 – Random Sampling |
Penthouse | Water Line Repair Project | LCD | Completed | Received/Posted | February 29, 2012 – Daily Logs/Lab Reports Domestic Waterline Repair Project |
Penthouse | Asbestos and Lead Based Paint Survey | LaCroix Davis | Completed | Received/Posted | February 29, 2012 – Asbestos and Lead Based Paint Survey |
Penthouse | Limited Drinking Water Quality Assessment | HTI | Completed | Received/Posted | January 6, 2012 – Limited Drinking Water Quality Assessment |
Penthouse | Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | September 29, 2011 – Mold Remediation – Penthouse Floor December 23, 2009 – May 11, 2010, April 25, 2011 – June 26, 2011, July 25, 2011 – August 22, 2011 Closure Report |
Penthouse | Window Reports: Forensic Analysis – Glass Breakage | Interactive Resources | Completed | Received/Posted | 450 N Street Final Report with Exhibits |
Penthouse | Mold Remediation Closure Report | LaCroix Davis | Completed | Received/Posted | September 29, 2011 – Mold Remediation – Penthouse Floor December 23, 2009 – May 11, 2010, April 25, 2011 – June 26, 2011, July 25, 2011 – August 22, 2011 Closure Report |
General Building Reports
Break Room Post Mitigation Clearance Summary Report
Work By | Date & Title of Report (click to see report) |
---|---|
BioMax | February 12, 2010 – Introduction |
BioMax | February 12, 2010 – Table of Contents |
Headquarters Scaffolding Reports
HQ Water Quality
Date & Title of Report (click to see report) |
---|
HQ Water Quality Report – 11/09/2016 |
Other CDTFA and BOE Offices
621 Capitol Mall
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
Annex Locations | 621 Capitol Mall – Water Leak | HTI | Completed | Received/Posted | 23rd Floor – Break Room 2324 Water Leak 1/16/2014 |
Annex Locations | 621 Capitol Mall – Limited Fungal Growth Exposure Assessment Surveys | HTI | Completed | Received/Posted | December 2013 – Random Sampling |
Annex Locations | 621 Capitol Mall – 24th Floor Surface Fungal Growth Assessment | HTI | Completed | Received/Posted | October 1, 2010 – Surface Fungal Growth Assessment Involving HQ 24th Floor Paintings at 621 Capitol Mall |
Annex Locations | MRC: 621 Capitol Mall – 24th Floor Surface Fungal Growth Assessment | HTI | Completed | Received/Posted | October 1, 2010 – Growth Assessment Involving HQ 24th Floor Paintings at 621 Capitol Mall |
FTB
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
FTB | Sampling Boxes from BOE | Entek | Completed | Received/Posted | February 20, 2008 – Evaluation of Dust on Boxes Moved from BOE to Franc hise Tax Board |
San Diego
Floor | Project/Event/Location | Work By | Status of Project | Status of Report | Date & Title of Report (click to see report) |
---|---|---|---|---|---|
San Diego | Limited Surface Particulate Composition Survey | HTI | Completed | Received/Posted | January 28, 2010 – Limited Surface Particulate Composition Survey1350 Front Street, San Diego, California |
Clearance Protocols
Letters
Subject | Work By | Date & Title of Report (click to see report) |
---|---|---|
Area Clearance Criteria | HTI | September 9, 2008 – Mold Growth Abatement Area Clearance Criteria |
Response to LaCroix Davis Letter | HTI | August 29, 2008 – Response to LaCroix Davis Letter dated August 27, 2008 |
Evaluation of Clearance Criteria | LaCroix Davis | August 27, 2008 – Evaluation of HTI Clearance Criteria |
Meeting with LaCroix Davis | HTI | August 21, 2008 – Meeting with LaCroix Davis Letter |
Water Intrusion Investigative Work | HTI | August 8, 2008 – Additional Water Intrusion Investigative Work |
Review of Post Mitigation Assessment Clearance Protocols | HTI | February 22, 2008 – Review of Draft Post Mitigation Assessment Clearance Protocols |
Post Mitigation Assessment Clearance Protocols | BioMax | February 15, 2008 – Post Mitigation Assessment Clearance Protocols |
Water Emergency Response Protocol
Subject | Work By | Date & Title of Report (click to see report) |
---|---|---|
BPM Water Emergency Response Plan | DGS | Water Emergency Response Protocol |